Most Hialeah homes were built between the 1950s and the 1980s, and a lot of them still have the original small bathroom. Below are 2026 price ranges for redoing one, and the two things that most often raise the final bill in this city: old cast-iron drains and permit work.
Refresh
Same layout, keep the tub. New vanity, toilet, faucets, lighting, paint and in most cases new floor tile.
Full remodel
Stripped to the block walls: new waterproofing, tiled shower or tub, vanity, fan and lighting.
High-end / new layout
Moving drains, curbless shower, custom vanity, large-format porcelain and replacing old cast-iron drain lines.
What goes into the price
A typical Hialeah bathroom is about 5 by 8 feet, inside a concrete-block house. Labor is the biggest part of the bill, and even a small room needs demolition, plumbing, waterproofing, tile and at least one inspection, so the price does not drop much with the size. Once the old tile comes off, it is common to find rotted backer board or a leaking valve that was not in the original quote.
Labor in Hialeah costs less than in Miami Beach, Coral Gables or Brickell, and the same job can come in a few thousand dollars lower here. The tile you pick moves the price too: marble-look porcelain runs from about $4 to $14 per square foot before installation.
Cast-iron drain pipes under the slab
Homes built in South Florida before the mid-1970s were built with cast-iron drain lines under the slab, and after 50 years or more many are cracked or scaled inside. The bathroom floor is already open during a remodel, so that is the cheapest time to check them.
Ask for a camera inspection of the drain before the new floor goes in. Expect to pay $150-$400. Replacing the section under the bathroom typically adds $2,000-$6,000, depending on how far the line runs. If the pipe fails after the remodel, the new floor tile has to come up.
Ventilation and mold
With South Florida humidity, a bathroom that is not sealed and vented properly grows mold fast. The quote should name a waterproofing membrane behind the shower tile (green board alone is not enough), a sloped shower pan, and an exhaust fan ducted to the outside rather than into the attic. A quiet 80-110 CFM fan on a timer or humidity switch adds roughly $250-$500 installed.
Permits and licenses in Hialeah
Changes to plumbing, electrical or walls need a permit from the City of Hialeah Building Department. Cosmetic work such as painting or replacing a vanity in the same spot does not. A licensed contractor pulls the permit and books the inspections. Be careful if a contractor asks you to pull an owner-builder permit for work they will do: in most cases they are not licensed for it, and the liability moves to you.
Check any contractor's license at myfloridalicense.com before you sign. Under Florida law, a contractor who takes a deposit of more than 10% must apply for the permit within 30 days and start work within 90 days after it is issued. If you sign the contract at home, federal and Florida rules generally give you 3 business days to cancel.
Before you sign
- License number checked at myfloridalicense.com
- Permit included and pulled by the contractor
- Waterproofing membrane named in the quote
- Fan ducted outside
- Cast-iron drain inspection (pre-1975 homes)
- Payment schedule tied to finished stages
Common questions
How much does a bathroom remodel cost in Hialeah?
Most Hialeah homeowners spend $12,000-$22,000 for a full remodel of a standard bathroom in 2026. A cosmetic refresh that keeps the tub and layout runs about $6,500-$11,000, and high-end remodels with layout changes run $24,000-$42,000 or more.
How long does a bathroom remodel take?
A full remodel of one bathroom takes 2-4 weeks of work, plus time for the permit. Refreshes can be done in about a week. Custom glass and special-order tile are the most common causes of delay.
Do I need a permit to remodel a bathroom in Hialeah?
If you are changing plumbing, electrical wiring or walls, yes. The contractor should pull the permit from the City of Hialeah Building Department and schedule the inspections. Simple cosmetic updates do not.
Can I remodel just the shower and keep the rest?
Yes. A tub-to-shower conversion or a shower-only remodel runs $6,000-$16,000 in Hialeah, depending on whether you choose an acrylic system or a fully tiled shower.